All public logs
Combined display of all available logs of ccitonlinewiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 08:13, 31 December 2019 Nicoivander (talk | contribs) posted a new comment on Talk:ANALISIS PERHITUNGAN RBI UNTUK PRODUCTION SEPARATOR KLA DAN ANALISIS ASSESSMENT UNTUK PRODUCTION SEPARATOR MRA (halo Aldo, 1. Weld Overlay sendiri adalah nama metode las yang digunakan pada Pressure Vessel. Weld Overlay secara garis besar adalah penambahan ketebalan pada bagian pressure vessel yang menipis, sehingga ketebalan pressure vessel kembali seperti de...)
- 22:39, 30 December 2019 Nicoivander (talk | contribs) posted a new comment on Talk:ANALISIS PERHITUNGAN RBI UNTUK PRODUCTION SEPARATOR KLA DAN ANALISIS ASSESSMENT UNTUK PRODUCTION SEPARATOR MRA (mohon maaf, tambahan untuk nomor 3, korosi utamanya terjadi karena oksidasi dan sulfur, ditambah dengan terjadinya erosi pada lapisan Production Separator, sehingga mempercepat terjadinya korosi)
- 22:37, 30 December 2019 Nicoivander (talk | contribs) posted a new comment on Talk:ANALISIS PERHITUNGAN RBI UNTUK PRODUCTION SEPARATOR KLA DAN ANALISIS ASSESSMENT UNTUK PRODUCTION SEPARATOR MRA (Halo Andaru, Dalam production separator saya, kasus korosi yang terjadi adalah korosi karena oksidasi dan sulfur, mengingat production separator saya adalah tipe 1st stage separator yang menerima well langsung dari wellhead. Dapat dilihat pada data c...)
- 22:26, 30 December 2019 Nicoivander (talk | contribs) posted a new comment on Talk:ANALISIS PERHITUNGAN RBI UNTUK PRODUCTION SEPARATOR KLA DAN ANALISIS ASSESSMENT UNTUK PRODUCTION SEPARATOR MRA (Halo Arkan, terima kasih telah membaca Laporan Kerja Praktik Saya. 1. Untuk inspeksi external sendiri hanya secara visual saja, mengingat kerusakan yang terjadi pada bagian external dari pressure vessel hanyalah korosi (Lihat Gambar 3.5, pada subab 3...)
- 16:00, 16 December 2019 Nicoivander (talk | contribs) posted a new comment on Talk:ANALISIS PERHITUNGAN RBI UNTUK PRODUCTION SEPARATOR KLA DAN ANALISIS ASSESSMENT UNTUK PRODUCTION SEPARATOR MRA (Halo Irfan, terima kasih telah membaca Laporan KP saya 1. Sebelum saya jawab pertanyaan ini, ada baiknya saya jelaskan dahulu mekanismenya. Penurunan tekanan fluida didalam separator memang mungkin terjadi, namun kasus ini biasanya terjadi karena dua...)
- 15:22, 16 December 2019 Nicoivander (talk | contribs) posted a new comment on Talk:ANALISIS DESAIN KEPALA FUEL GAS KNOCK OUT POT DI TUNU FIELD – NORTH PROCESSING UNIT MENJADI FLANGED HEAD UNTUK MEMUDAHKAN KEGIATAN MAINTENANCE (Halo Andaru, saya ada sedikit pertanyaan : 1. Pada subab 3.1.3. terdapat komponen blind flanges dan flanged head pada gambar, apakah fungai dari komponen tersebut? 2. Pada subab 4.4 perancangan menurut standar, ada istilah load case combination, ap...)
- 15:01, 16 December 2019 Nicoivander (talk | contribs) uploaded File:Corrosion Sampling.GIF
- 08:41, 4 December 2019 Nicoivander (talk | contribs) posted a new comment on Talk:Evaluasi Integrity Management (IM) Cycle pada Heat Exchanger LIMA E-1300A (Fin Fan AfterCooler 2nd Stage) dan Risk-Based Inspection (RBI) Berbasis API 581 di LCOM-05-V-3 (Residue Gas Separator) (Halo Irfan, laporan yang sangat baik. Namun saya ada beberapa pertanyaan : 1. Apakah tekanan well yang melewati heat exchanger akan berubah sewaktu2? 2. Kondisi well apa yang melewati heat exchanger (hasil 1st stage separator? Atau 2nd stage separa...)
- 17:19, 26 November 2019 Nicoivander (talk | contribs) posted a new comment on Talk:Reutilization of Ex-Used ESDV for New Well Connection at Pertamina Hulu Mahakam (Hello, I'm curious for the PSLL, PSHH, and ESDV pressure settings. Does the pressure setting for those 3 components always kept same or changing depends on a certain conditions? Thank you 😁 Nico Ivander - 1606907562)
- 17:09, 26 November 2019 Nicoivander (talk | contribs) posted a new comment on Talk:Evaluasi Integrity Management (IM) Cycle di Piping KLB Train A Discharge Aftercooler dan RBI Berbasis API 581 di LPRO-LPV-6 (Atmospheric Separator) (Halo Aldo, ingin bertanya menngenai kondisi penurunan MAWP. Bagamiana Pertamina memutuskan untuk memilih mengembalikan kondisi MAWP atau mengubah settingan MOP-nya?)
- 14:43, 22 November 2019 Nicoivander (talk | contribs) posted a new comment on Reutilization of Ex-Used ESDV for New Well Connection at Pertamina Hulu Mahakam (Hello, I'm curious for the PSLL, PSHH, and ESDV pressure settings. Does the pressure setting for those 3 components always kept same or changing depends on a certain conditions? Thank you 😁 Nico Ivander - 1606907562)
- 14:52, 19 November 2019 User account Nicoivander (talk | contribs) was created