Difference between revisions of "Reutilization of Ex-Used ESDV for New Well Connection at Pertamina Hulu Mahakam"

From ccitonlinewiki
Jump to: navigation, search
Line 37: Line 37:
 
                 4.4.1 Tunu Remote Well Safety Instrumented System
 
                 4.4.1 Tunu Remote Well Safety Instrumented System
 
                 4.4.2 ESDV Activation
 
                 4.4.2 ESDV Activation
 
 
'''CHAPTER V STUDY CASE'''
 
'''CHAPTER V STUDY CASE'''
5.1 Valve Coupling Modification
+
        5.1 Valve Coupling Modification
5.1.1 Coupling Geometry
+
                5.1.1 Coupling Geometry
5.1.2 Calculation of Top Coupling Connection (Coupling to Actuator)
+
                5.1.2 Calculation of Top Coupling Connection (Coupling to Actuator)
5.1.3 Calculation of Bottom Coupling Connection (Coupling to Valve)
+
                5.1.3 Calculation of Bottom Coupling Connection (Coupling to Valve)
5.2 ESDV Ball Valve Acceptance Criteria
+
        5.2 ESDV Ball Valve Acceptance Criteria
5.2.1 Shell Test (Water)
+
                5.2.1 Shell Test (Water)
5.2.2 High Pressure Closure Test (Water)
+
                5.2.2 High Pressure Closure Test (Water)
5.2.3 Low Pressure Closure Test (Air or Nitrogen)
+
                5.2.3 Low Pressure Closure Test (Air or Nitrogen)
5.2.4 High Pressure Closure Test (Nitrogen)
+
                5.2.4 High Pressure Closure Test (Nitrogen)
5.3 Evaluation for Ex-Used ESDV Reutilization
+
        5.3 Evaluation for Ex-Used ESDV Reutilization
5.3.1 Actual Cost & Delivery Time of New ESDV
+
                5.3.1 Actual Cost & Delivery Time of New ESDV
5.3.2 Estimated Breakdown Cost/Duration for Ex-Used ESDV Reutilization
+
                5.3.2 Estimated Breakdown Cost/Duration for Ex-Used ESDV Reutilization
5.3.3 Estimated Breakdown Duration for Ball Valve & Actuator Repair
+
                5.3.3 Estimated Breakdown Duration for Ball Valve & Actuator Repair
5.3.4 Examples of ESDV Repair/Modification Estimated Cost & Duration
+
                5.3.4 Examples of ESDV Repair/Modification Estimated Cost & Duration
5.3.5 New & Repair/Modification ESDV Comparison in Terms of Cost & Duration
+
                5.3.5 New & Repair/Modification ESDV Comparison in Terms of Cost & Duration
5.3.6 Highest/Lowest Cost & Duration of ESDV Repair/Modification
+
                5.3.6 Highest/Lowest Cost & Duration of ESDV Repair/Modification
5.3.7 Quality of Reused/Repaired ESDV
+
                5.3.7 Quality of Reused/Repaired ESDV
 
 
 
'''CHAPTER VI CONCLUSION & RECOMMENDATION'''
 
'''CHAPTER VI CONCLUSION & RECOMMENDATION'''
 
 
'''REFERENCE'''
 
'''REFERENCE'''
 
 
'''APPENDIX'''
 
'''APPENDIX'''

Revision as of 17:32, 18 September 2019

This page will discuss about the reutilization of Ex-Used ESDV (emergency shut down valve) for new well connection at an Oil and Gas company, namely Pertamina Hulu Mahakam. ESDV has the function to shut-off the flow of fluid from the well head into the pipeline that distributes gas to prevent from pipeline damage. The topic will mainly focus on the reutilization of Ex-Used ESDV from past existing well to be used for future well connection. There are 2 study case, the first one is the fabrication of new coupling part that has the function to connect between the ball valve and actuator of the ESDV. The second study case is the evaluation of reutilized ex-used ESDV compared to new purchase ESDV in terms of cost, time, and quality.


ON JOB TRAINING FINAL REPORT REUTILIZATION OF EX-USED ESDV FOR NEW WELL CONNECTION AT PERTAMINA HULU MAHAKAM

TABLE OF CONTENT CHAPTER I INTRODUCTION

       1.1 Background
       1.2 Objectives
       1.3 Scope
       1.4 Methodology
       1.5 Date and Place of the On Job Training
       1.6 Report Outline

CHAPTER II COMPANY PROFILE

       2.1 Background of PT Pertamina Hulu Mahakam (PHM)
       2.2 Vission and Mission of PT Pertamina (Persero)
       2.3 Vission and Mission of PT Pertamina Hulu Mahakam
       2.4 PT Pertamina (Persero) Priorities
       2.5 PHM Operation Sites
       2.6 PHM Organizational Structure
       2.7 ECP (Engineering, Construction & Brownfield Project) Division
       2.8 ECP/CST (Construction)

CHAPTER III ESDV BASIC INFORMATION

       3.1 What is Emergency SDV or SDV (Shutdown Valve)
       3.2 Valves
               3.2.1 Valve Types
       3.3 Actuators
               3.3.1 Actuated Actuator Types

CHAPTER IV WELL CONNECTION & ESDV UTILIZATION

       4.1 Oil and Gas Indsustry Sectors
       4.2 Upstream Activities
       4.3 Well Connection
               4.3.1 Location
               4.3.2 Well Slot Availability
               4.3.3 Well Connection Sequence
       4.4 Utilization of ESDV in PHM Well Connection
               4.4.1 Tunu Remote Well Safety Instrumented System
               4.4.2 ESDV Activation

CHAPTER V STUDY CASE

       5.1 Valve Coupling Modification
               5.1.1 Coupling Geometry
               5.1.2 Calculation of Top Coupling Connection (Coupling to Actuator)
               5.1.3 Calculation of Bottom Coupling Connection (Coupling to Valve)
       5.2 ESDV Ball Valve Acceptance Criteria
               5.2.1 Shell Test (Water)
               5.2.2 High Pressure Closure Test (Water)
               5.2.3 Low Pressure Closure Test (Air or Nitrogen)
               5.2.4 High Pressure Closure Test (Nitrogen)
       5.3 Evaluation for Ex-Used ESDV Reutilization
               5.3.1 Actual Cost & Delivery Time of New ESDV
               5.3.2 Estimated Breakdown Cost/Duration for Ex-Used ESDV Reutilization
               5.3.3 Estimated Breakdown Duration for Ball Valve & Actuator Repair
               5.3.4 Examples of ESDV Repair/Modification Estimated Cost & Duration
               5.3.5 New & Repair/Modification ESDV Comparison in Terms of Cost & Duration
               5.3.6 Highest/Lowest Cost & Duration of ESDV Repair/Modification
               5.3.7 Quality of Reused/Repaired ESDV

CHAPTER VI CONCLUSION & RECOMMENDATION REFERENCE APPENDIX