Difference between revisions of "Student Internship"
Hananashrawi (talk | contribs) |
m |
||
Line 1: | Line 1: | ||
== [[ANALYSIS OF RENEWABLE-ENERGY SOURCES FOR ELECTRICITY GENERATION SYSTEM IN JAWA-BALI]] by [[Hanan Ashrawi]] == | == [[ANALYSIS OF RENEWABLE-ENERGY SOURCES FOR ELECTRICITY GENERATION SYSTEM IN JAWA-BALI]] by [[Hanan Ashrawi]] == | ||
+ | *2020 | ||
+ | *1 [[Reutilization of Ex-Used ESDV for New Well Connection at Pertamina Hulu Mahakam]] by [[Arkan Fadhillah Cesnanda]] | ||
− | + | *2 | |
− | + | *3 | |
− | + | *2019 | |
+ | *1 [[Evaluasi Integrity Management (IM) Cycle di Piping KLB Train A Discharge Aftercooler dan RBI Berbasis API 581 di LPRO-LPV-6 (Atmospheric Separator)]] by [[Aldo Renaldy]] == | ||
− | + | *2 [[Evaluasi Integrity Management (IM) Cycle pada Heat Exchanger LIMA E-1300A (Fin Fan AfterCooler 2nd Stage) dan Risk-Based Inspection (RBI) Berbasis API 581 di LCOM-05-V-3 (Residue Gas Separator) ]] oleh [[Irfan Pratantyo]] == | |
− | == [[ANALISIS PERHITUNGAN RBI UNTUK PRODUCTION SEPARATOR KLA DAN ANALISIS ASSESSMENT UNTUK PRODUCTION SEPARATOR MRA]] oleh Nico Ivander == | + | *3 [[ANALISIS DESAIN KEPALA FUEL GAS KNOCK OUT POT DI TUNU FIELD – NORTH PROCESSING UNIT MENJADI FLANGED HEAD UNTUK MEMUDAHKAN KEGIATAN MAINTENANCE]] oleh Andaru Wiratama == |
+ | |||
+ | *4 [[ANALISIS PERHITUNGAN RBI UNTUK PRODUCTION SEPARATOR KLA DAN ANALISIS ASSESSMENT UNTUK PRODUCTION SEPARATOR MRA]] oleh Nico Ivander == |
Revision as of 10:32, 17 December 2020
ANALYSIS OF RENEWABLE-ENERGY SOURCES FOR ELECTRICITY GENERATION SYSTEM IN JAWA-BALI by Hanan Ashrawi
- 2020
- 1 Reutilization of Ex-Used ESDV for New Well Connection at Pertamina Hulu Mahakam by Arkan Fadhillah Cesnanda
- 2
- 3
- 2019
- 1 Evaluasi Integrity Management (IM) Cycle di Piping KLB Train A Discharge Aftercooler dan RBI Berbasis API 581 di LPRO-LPV-6 (Atmospheric Separator) by Aldo Renaldy ==
- 2 Evaluasi Integrity Management (IM) Cycle pada Heat Exchanger LIMA E-1300A (Fin Fan AfterCooler 2nd Stage) dan Risk-Based Inspection (RBI) Berbasis API 581 di LCOM-05-V-3 (Residue Gas Separator) oleh Irfan Pratantyo ==