Difference between revisions of "Student Internship"
(10 intermediate revisions by 6 users not shown) | |||
Line 1: | Line 1: | ||
− | + | *2020 | |
− | [[ | + | *1 [[ANALYSIS OF RENEWABLE-ENERGY SOURCES FOR ELECTRICITY GENERATION SYSTEM IN JAWA-BALI]] by [[Hanan Ashrawi]] |
− | [[Evaluasi Integrity Management (IM) Cycle pada Heat Exchanger LIMA E-1300A (Fin Fan AfterCooler 2nd Stage)]] oleh [[Irfan Pratantyo]] | + | *2 [[Penerapan Metode Failure Mode And Effect Analysis (FMEA) Untuk Mengkuantifikasi Rekam Data Kegagalan Turbin Gas PT. Dian Swastatika Sentosa TBK.]] by [[M. Rasyaad Dzaky]] dan [[Ahmad Muzakki]] |
+ | |||
+ | *3 [[Pengembangan dan Analisis Kondisi Kegagalan Desain Baran Power Pack dengan Menggunakan Kriteria Von Mises di PT. Aldebaran Rekayasa Cipta]] by [[Yogasatya Adikhansa]] | ||
+ | |||
+ | |||
+ | |||
+ | *2019 | ||
+ | |||
+ | *1[[Reutilization of Ex-Used ESDV for New Well Connection at Pertamina Hulu Mahakam]] by [[Arkan Fadhillah Cesnanda]] | ||
+ | |||
+ | *2 [[Evaluasi Integrity Management (IM) Cycle di Piping KLB Train A Discharge Aftercooler dan RBI Berbasis API 581 di LPRO-LPV-6 (Atmospheric Separator)]] by [[Aldo Renaldy]] | ||
+ | |||
+ | *3 [[Evaluasi Integrity Management (IM) Cycle pada Heat Exchanger LIMA E-1300A (Fin Fan AfterCooler 2nd Stage) dan Risk-Based Inspection (RBI) Berbasis API 581 di LCOM-05-V-3 (Residue Gas Separator) ]] oleh [[Irfan Pratantyo]] | ||
+ | |||
+ | *4 [[ANALISIS DESAIN KEPALA FUEL GAS KNOCK OUT POT DI TUNU FIELD – NORTH PROCESSING UNIT MENJADI FLANGED HEAD UNTUK MEMUDAHKAN KEGIATAN MAINTENANCE]] oleh Andaru Wiratama | ||
+ | |||
+ | *5 [[ANALISIS PERHITUNGAN RBI UNTUK PRODUCTION SEPARATOR KLA DAN ANALISIS ASSESSMENT UNTUK PRODUCTION SEPARATOR MRA]] oleh Nico Ivander |
Latest revision as of 13:03, 21 January 2021
- 2020
- 1 ANALYSIS OF RENEWABLE-ENERGY SOURCES FOR ELECTRICITY GENERATION SYSTEM IN JAWA-BALI by Hanan Ashrawi
- 2 Penerapan Metode Failure Mode And Effect Analysis (FMEA) Untuk Mengkuantifikasi Rekam Data Kegagalan Turbin Gas PT. Dian Swastatika Sentosa TBK. by M. Rasyaad Dzaky dan Ahmad Muzakki
- 3 Pengembangan dan Analisis Kondisi Kegagalan Desain Baran Power Pack dengan Menggunakan Kriteria Von Mises di PT. Aldebaran Rekayasa Cipta by Yogasatya Adikhansa
- 2019
- 1Reutilization of Ex-Used ESDV for New Well Connection at Pertamina Hulu Mahakam by Arkan Fadhillah Cesnanda
- 2 Evaluasi Integrity Management (IM) Cycle di Piping KLB Train A Discharge Aftercooler dan RBI Berbasis API 581 di LPRO-LPV-6 (Atmospheric Separator) by Aldo Renaldy
- 3 Evaluasi Integrity Management (IM) Cycle pada Heat Exchanger LIMA E-1300A (Fin Fan AfterCooler 2nd Stage) dan Risk-Based Inspection (RBI) Berbasis API 581 di LCOM-05-V-3 (Residue Gas Separator) oleh Irfan Pratantyo