Difference between revisions of "Student Internship"

From ccitonlinewiki
Jump to: navigation, search
m
m
Line 1: Line 1:
== [[ANALYSIS OF RENEWABLE-ENERGY SOURCES FOR ELECTRICITY GENERATION SYSTEM IN JAWA-BALI]] by [[Hanan Ashrawi]] ==
 
 
*2020
 
*2020
*1 [[Reutilization of Ex-Used ESDV for New Well Connection at Pertamina Hulu Mahakam]] by [[Arkan Fadhillah Cesnanda]]  
+
 
 +
*1 [[ANALYSIS OF RENEWABLE-ENERGY SOURCES FOR ELECTRICITY GENERATION SYSTEM IN JAWA-BALI]] by [[Hanan Ashrawi]]  
 +
 
 +
  
 
*2
 
*2
Line 8: Line 10:
  
 
*2019
 
*2019
*1 [[Evaluasi Integrity Management (IM) Cycle di Piping KLB Train A Discharge Aftercooler dan RBI Berbasis API 581 di LPRO-LPV-6 (Atmospheric Separator)]] by [[Aldo Renaldy]] ==
 
  
*2 [[Evaluasi Integrity Management (IM) Cycle pada Heat Exchanger LIMA E-1300A (Fin Fan AfterCooler 2nd Stage) dan Risk-Based Inspection (RBI) Berbasis API 581 di LCOM-05-V-3 (Residue Gas Separator) ]] oleh [[Irfan Pratantyo]] ==
+
*1[[Reutilization of Ex-Used ESDV for New Well Connection at Pertamina Hulu Mahakam]] by [[Arkan Fadhillah Cesnanda]]
 +
 
 +
*2 [[Evaluasi Integrity Management (IM) Cycle di Piping KLB Train A Discharge Aftercooler dan RBI Berbasis API 581 di LPRO-LPV-6 (Atmospheric Separator)]] by [[Aldo Renaldy]]
 +
 
 +
*3 [[Evaluasi Integrity Management (IM) Cycle pada Heat Exchanger LIMA E-1300A (Fin Fan AfterCooler 2nd Stage) dan Risk-Based Inspection (RBI) Berbasis API 581 di LCOM-05-V-3 (Residue Gas Separator) ]] oleh [[Irfan Pratantyo]]
  
*3 [[ANALISIS DESAIN KEPALA FUEL GAS KNOCK OUT POT DI TUNU FIELD – NORTH PROCESSING UNIT MENJADI FLANGED HEAD UNTUK MEMUDAHKAN KEGIATAN MAINTENANCE]] oleh Andaru Wiratama ==
+
*4 [[ANALISIS DESAIN KEPALA FUEL GAS KNOCK OUT POT DI TUNU FIELD – NORTH PROCESSING UNIT MENJADI FLANGED HEAD UNTUK MEMUDAHKAN KEGIATAN MAINTENANCE]] oleh Andaru Wiratama
  
*4 [[ANALISIS PERHITUNGAN RBI UNTUK PRODUCTION SEPARATOR KLA DAN ANALISIS ASSESSMENT UNTUK PRODUCTION SEPARATOR MRA]] oleh Nico Ivander ==
+
*5 [[ANALISIS PERHITUNGAN RBI UNTUK PRODUCTION SEPARATOR KLA DAN ANALISIS ASSESSMENT UNTUK PRODUCTION SEPARATOR MRA]] oleh Nico Ivander

Revision as of 10:34, 17 December 2020