File list

Jump to: navigation, search

This special page shows all uploaded files.

File list
 
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size Description Versions
15:18, 26 October 2019 Tabel 5.36 Wall Thickness Measurement Report Juli 2013 by PHE ONWJ.png (file) 1.07 MB   1
15:20, 26 October 2019 Tabel 5.36 Wall Thickness Measurement Report Juli 2013.png (file) 963 KB   1
12:13, 26 October 2019 Gambar 5.25 Hasil Inspeksi Production Separator MRA Juli 2013 by PHE ONWJ.png (file) 723 KB   1
15:51, 25 October 2019 Gambar 3.5 Pengkategorian Visual Inspection.png (file) 586 KB   1
12:14, 26 October 2019 Gambar 5.26 Titik Koordinat Inspeksi Production Separator MRA Juli 2013 by PHE ONWJ.png (file) 391 KB   1
15:04, 25 October 2019 Gambar 3.2 Metodologi Probability of Failure (PoF) untuk Damage Thinning.png (file) 288 KB   1
15:21, 26 October 2019 Gambar 5.27 Penempatan Daerah Kritis pada Production Separator MRA Juli 2013 by PHE ONWJ.png (file) 231 KB   1
15:37, 26 October 2019 Gambar 5.28 Visualisasi defect area dan after surface preparation pada weld overlay.png (file) 224 KB   1
21:26, 25 October 2019 Tabel 4.1 Klasifikasi Kategori Anomali dan Recommendation (Sumber SFIMS, page 26).png (file) 217 KB   1
15:59, 25 October 2019 Gambar 3.7 PFD Production Separator KLA.png (file) 189 KB   1
16:03, 25 October 2019 Gambar 3.8 PID Production Separator KLA.png (file) 170 KB   1
15:58, 25 October 2019 Gambar 3.6 Production Separator.png (file) 101 KB   1
21:39, 25 October 2019 Gambar 5.1 Perhitungan S, E, dan Tmin.png (file) 101 KB   1
16:09, 25 October 2019 Gambar 3.10 PID Production Separator MRA.png (file) 91 KB   1
15:28, 25 October 2019 Tabel 3.5 Cost Reference of Production Separator KLA.JPG (file) 83 KB   1
16:06, 25 October 2019 Gambar 3.9 PFD Production Separator MRA.png (file) 76 KB   1
14:54, 25 October 2019 Tabel 3.3 Key Element of PSIM based on PHE ONWJ PSIM.JPG (file) 70 KB   1
09:43, 26 October 2019 Gambar 5.12 Rumus Release Rate aktual.JPG (file) 62 KB   1
15:34, 26 October 2019 Tabel 5.37 Klasifikasi Kategori Anomali dan Recommendation (Sumber SFIMS, page 26).JPG (file) 61 KB   1
09:22, 26 October 2019 Gambar 5.4 Rumus Inspection effectiveness factor.JPG (file) 61 KB   1
15:25, 25 October 2019 Tabel 3.4 Cost on Production separator KLA.JPG (file) 61 KB   1
12:10, 26 October 2019 Tabel 5.35 Serfice Fluid (Sumber Operating Envelope Mike-Mike 2013, page 17).JPG (file) 60 KB   1
09:57, 26 October 2019 Gambar 5.17 Rumus FC Component Damage.JPG (file) 56 KB   1
21:33, 25 October 2019 Spesifikasi Production Separator KLA.JPG (file) 55 KB   1
09:21, 26 October 2019 Gambar 5.4 Rumus Inspection effectiveness factor (Sumber API 581, page 157).JPG (file) 55 KB Reverted to version as of 09:20, 26 October 2019 (WIB) 4
09:14, 26 October 2019 Tabel 5.4 Pengkategorian Inspection Effectiveness (Sumber API 581, page 440).png (file) 47 KB   1
21:21, 25 October 2019 Gambar 4.3 Metodologi Assessment.JPG (file) 45 KB   1
15:56, 25 October 2019 Tabel 3.10 Aktivitas Tindakan Preventif dan Korektif (Sumber SFIMS, page 25).png (file) 45 KB   1
09:41, 26 October 2019 Tabel 5.19 Kategori Leak Duration Maximum Berdasarkan Detection dan Isolation (Sumber API 581, page 503).JPG (file) 44 KB   1
10:00, 26 October 2019 Gambar 5.20 Rumus FC Personnel Injury.JPG (file) 44 KB   1
21:06, 25 October 2019 Gambar 4.1 Metodologi Perhitungan RBI.JPG (file) 42 KB   1
14:13, 14 October 2019 Tabel 3.1. Generic Failure Frequency.png (file) 41 KB   1
15:56, 26 October 2019 Gambar 2.4 Peta Aliran Produksi Minyak dan Gas PHE ONWJ (Slide Profil Perusahaan, 2012).JPG (file) 38 KB   1
09:34, 14 October 2019 3.1. IM Cycle.png (file) 37 KB 3.1. IM Cycle 1
12:01, 26 October 2019 Gambar 5.24 Grafik Kenaikan PoF Setiap Tahun.JPG (file) 37 KB   1
12:09, 26 October 2019 Tabel 5.34 Corrosion Monitoring Data (13-25 Juli 2019) by PHE ONWJ.JPG (file) 36 KB   1
09:27, 26 October 2019 Gambar 5.6 Rumus Parameter of Reliability.JPG (file) 36 KB   1
09:31, 26 October 2019 Gambar 5.8 Rumus Damage Factor for Thinning.JPG (file) 34 KB   1
09:33, 26 October 2019 Tabel 5.14 Pengkategorian PoF (Sumber API 581, page 32).JPG (file) 34 KB   1
09:46, 26 October 2019 Gambar 5.15 Rumus CA Flammable Personnel injury dan Component Damage.JPG (file) 34 KB   1
15:55, 26 October 2019 Gambar 2.3 Wilayah Operasi PHE ONWJ (Slide Profil Perusahaan, 2012).JPG (file) 31 KB   1
09:28, 26 October 2019 Gambar 5.7 Rumus Base Damage Factor.JPG (file) 30 KB   1
09:54, 26 October 2019 Gambar 5.16.JPG (file) 29 KB   1
15:34, 25 October 2019 Gambar 3.4 Risk Matrix by PHE ONWJ.JPG (file) 28 KB   1
15:31, 25 October 2019 Gambar 3.3 Metodologi Consequence of Failure (CoF).png (file) 28 KB   1
15:52, 26 October 2019 Gambar 2.2 Grafik Perkembangan Produksi Gas Blok ONWJ (Slide Profil Perusahaan, 2012).JPG (file) 26 KB   1
12:05, 26 October 2019 Spesifikasi Production Separator MRA.JPG (file) 25 KB   1
09:39, 26 October 2019 Gambar 5.11 Rumus Jumlah Teoritis Massa Fluida yang Keluar.JPG (file) 25 KB   1
15:39, 25 October 2019 Tabel 3.8 Hubungan antara PoF dan CoF dalam besaran nominal mata uang dollar (Sumber API 581, page 33).png (file) 25 KB   1
15:54, 25 October 2019 Tabel 3.9 Klasifikasi Kategori Anomali dan Recommendation (Sumber SFIMS, page 26).png (file) 25 KB   1
First pagePrevious pageNext pageLast page