File list

Jump to: navigation, search

This special page shows all uploaded files.

File list
 
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size Description Versions
09:14, 26 October 2019 Tabel 5.4 Pengkategorian Inspection Effectiveness (Sumber API 581, page 440).png (file) 47 KB   1
09:21, 26 October 2019 Gambar 5.4 Rumus Inspection effectiveness factor (Sumber API 581, page 157).JPG (file) 55 KB Reverted to version as of 09:20, 26 October 2019 (WIB) 4
21:33, 25 October 2019 Spesifikasi Production Separator KLA.JPG (file) 55 KB   1
09:57, 26 October 2019 Gambar 5.17 Rumus FC Component Damage.JPG (file) 56 KB   1
12:10, 26 October 2019 Tabel 5.35 Serfice Fluid (Sumber Operating Envelope Mike-Mike 2013, page 17).JPG (file) 60 KB   1
15:25, 25 October 2019 Tabel 3.4 Cost on Production separator KLA.JPG (file) 61 KB   1
09:22, 26 October 2019 Gambar 5.4 Rumus Inspection effectiveness factor.JPG (file) 61 KB   1
15:34, 26 October 2019 Tabel 5.37 Klasifikasi Kategori Anomali dan Recommendation (Sumber SFIMS, page 26).JPG (file) 61 KB   1
09:43, 26 October 2019 Gambar 5.12 Rumus Release Rate aktual.JPG (file) 62 KB   1
14:54, 25 October 2019 Tabel 3.3 Key Element of PSIM based on PHE ONWJ PSIM.JPG (file) 70 KB   1
16:06, 25 October 2019 Gambar 3.9 PFD Production Separator MRA.png (file) 76 KB   1
15:28, 25 October 2019 Tabel 3.5 Cost Reference of Production Separator KLA.JPG (file) 83 KB   1
16:09, 25 October 2019 Gambar 3.10 PID Production Separator MRA.png (file) 91 KB   1
21:39, 25 October 2019 Gambar 5.1 Perhitungan S, E, dan Tmin.png (file) 101 KB   1
15:58, 25 October 2019 Gambar 3.6 Production Separator.png (file) 101 KB   1
16:03, 25 October 2019 Gambar 3.8 PID Production Separator KLA.png (file) 170 KB   1
15:59, 25 October 2019 Gambar 3.7 PFD Production Separator KLA.png (file) 189 KB   1
21:26, 25 October 2019 Tabel 4.1 Klasifikasi Kategori Anomali dan Recommendation (Sumber SFIMS, page 26).png (file) 217 KB   1
15:37, 26 October 2019 Gambar 5.28 Visualisasi defect area dan after surface preparation pada weld overlay.png (file) 224 KB   1
15:21, 26 October 2019 Gambar 5.27 Penempatan Daerah Kritis pada Production Separator MRA Juli 2013 by PHE ONWJ.png (file) 231 KB   1
15:04, 25 October 2019 Gambar 3.2 Metodologi Probability of Failure (PoF) untuk Damage Thinning.png (file) 288 KB   1
12:14, 26 October 2019 Gambar 5.26 Titik Koordinat Inspeksi Production Separator MRA Juli 2013 by PHE ONWJ.png (file) 391 KB   1
15:51, 25 October 2019 Gambar 3.5 Pengkategorian Visual Inspection.png (file) 586 KB   1
12:13, 26 October 2019 Gambar 5.25 Hasil Inspeksi Production Separator MRA Juli 2013 by PHE ONWJ.png (file) 723 KB   1
15:20, 26 October 2019 Tabel 5.36 Wall Thickness Measurement Report Juli 2013.png (file) 963 KB   1
15:18, 26 October 2019 Tabel 5.36 Wall Thickness Measurement Report Juli 2013 by PHE ONWJ.png (file) 1.07 MB   1
First pagePrevious pageNext pageLast page