Evaluasi Integrity Management (IM) Cycle di Piping KLB Train A Discharge Aftercooler dan RBI Berbasis API 581 di LPRO-LPV-6 (Atmospheric Separator)

From ccitonlinewiki
Revision as of 22:16, 11 October 2019 by Aldorenaldy (talk | contribs) (Created page with " BAB 1 PENDAHULUAN 1.1. Latar Belakang 1.2. Tujuan 1.3. Waktu dan Tempat Pelaksanaan 1.4. Ruang Lingkup 1.5. Metode Penulisan BAB 2 DESKRIPSI PERUSAHAAN 2.1. Profil Pe...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search


BAB 1 PENDAHULUAN 1.1. Latar Belakang 1.2. Tujuan 1.3. Waktu dan Tempat Pelaksanaan 1.4. Ruang Lingkup 1.5. Metode Penulisan BAB 2 DESKRIPSI PERUSAHAAN 2.1. Profil Perusahaan 2.2. Sejarah Perusahaan 2.3. Visi dan Misi 2.4. Proyek Perusahaan 2.5. Lokasi dan Tata Letak Pabrik BAB 3 METODE PENULISAN 3.1. Pendahuluan 3.2. Strategi Integrity Management (IM) 3.2.1. Perencanaan dan penjadwalan program 3.2.2. Inspeksi dan Corrosion Monitoring 3.2.3. Penilaian Hasil Inspeksi dan Rekomendasi 3.2.4. Mitigasi dari Hasil Penilaian BAB 4 ANALISIS DATA 4.1. Perencanaan RBI pada LPRO-LPV-6 4.1.1. Perhitungan Probability of Failure (PoF) 4.1.2. Perhitungan Consequence of Failure (CoF) 4.1.3. Perencanaan Waktu Inspeksi dari RBI 4.2. Inspection dan Corrosion Monitoring pada Piping KLB Train A Discharge Aftercooler 4.3. Penilaian Hasil Inspeksi dan Rekomendasi 4.4. Mitigasi dari Hasil Penilaian BAB 5 SITE VISIT 5.1. Pendahuluan 5.2. Deskripsi Fasilitas 5.3. Deskripsi Alat 5.3.1. Pig Receiver (MK-R-50-01) 5.3.2. Inlet Slug Catcher (MK-V-51-01) 5.3.3. Filter Separator (MK-V-54-01) 5.3.4. Pig Launcher (MK-L-56-01) 5.3.5. Liquid Holding Tank (MK-T-57-01) 5.3.6. Slop Pump (MK-P-58-01) 5.4. Deskripsi Proses BAB 6 PENUTUP 6.1. Kesimpulan DAFTAR PUSTAKA