Difference between revisions of "ANALYSIS OF RENEWABLE-ENERGY SOURCES FOR ELECTRICITY GENERATION SYSTEM IN JAWA-BALI"
Hananashrawi (talk | contribs) (Created page with "= '''TABLE OF CONTENT''' = '''CHAPTER I INTRODUCTION''' :1.1 Background :1.2 Report Objectives :1.3 Scope of the Report :1.4 Date and Place of the On Job Training :1.5 Report...") |
Hananashrawi (talk | contribs) (→TABLE OF CONTENT) |
||
Line 34: | Line 34: | ||
:5.1 Data Analysis | :5.1 Data Analysis | ||
'''CHAPTER VI CONCLUSION''' | '''CHAPTER VI CONCLUSION''' | ||
− | 6.1 Conclusions | + | :6.1 Conclusions |
− | 6.2 Internship Result | + | :6.2 Internship Result |
'''REFERENCE''' | '''REFERENCE''' |
Revision as of 10:03, 15 December 2020
TABLE OF CONTENT
CHAPTER I INTRODUCTION
- 1.1 Background
- 1.2 Report Objectives
- 1.3 Scope of the Report
- 1.4 Date and Place of the On Job Training
- 1.5 Report Outline
CHAPTER II COMPANY PROFILE
- 2.1 About PT. PLN (Persero)
- 2.1.1 Company Logo
- 2.1.2 COmpany's Vision and Mission
- 2.1.3 COmpany's Value
- 2.2 PT. PLN (Persero) UIP2B
CHAPTER III BASIC THEORY
- 3.1 Renewable Energy Definition
- 3.2 Renewable Energy Sources in Indonesia
- 3.2.1 Hydropower
- 3.2.2 Wind
- 3.2.3 Solar
- 3.2.4 Biofuel and Waste
- 3.3.Renewable Power Plant in Indonesia
- 3.3.1 PLTA (Pembangkit Listrik Tenaga Air)
- 3.3.2 PLTB (Pembangkit Listrik Tenaga Bayu)
- 3.3.1 PLTS (Pembangkit Listrik Tenaga Surya)
- 3.3.1 PLTBg (Pembangkit Listrik Tenaga Biogas)
- 3.3.1 PLTBm (Pembangkit Listrik Tenaga Biomassa)
CHAPTER IV DATA COMPILATION
- 4.1 2017 National Energy Plan (RUEN)
- 4.2 2019-2038 National Electricity Plan (RUKN)
- 4.3 2019-2029 Electricity Supply Business Plan (RUPTL)
- 4.4 2019 Java-Bali System Operation Evaluation (EOT 2019 PT. PLN UIP2B)
CHAPTER V DATA ANALYSIS
- 5.1 Data Analysis
CHAPTER VI CONCLUSION
- 6.1 Conclusions
- 6.2 Internship Result
REFERENCE