Difference between revisions of "Evaluasi Integrity Management (IM) Cycle di Piping KLB Train A Discharge Aftercooler dan RBI Berbasis API 581 di LPRO-LPV-6 (Atmospheric Separator)"
Aldorenaldy (talk | contribs) (Created page with " BAB 1 PENDAHULUAN 1.1. Latar Belakang 1.2. Tujuan 1.3. Waktu dan Tempat Pelaksanaan 1.4. Ruang Lingkup 1.5. Metode Penulisan BAB 2 DESKRIPSI PERUSAHAAN 2.1. Profil Pe...") |
Aldorenaldy (talk | contribs) |
||
Line 1: | Line 1: | ||
− | + | = '''Daftar Isi'' = | |
− | BAB 1 PENDAHULUAN | + | :'''BAB 1 PENDAHULUAN''' |
− | 1.1. Latar Belakang | + | :1.1. Latar Belakang |
− | 1.2. Tujuan | + | :1.2. Tujuan |
− | 1.3. Waktu dan Tempat Pelaksanaan | + | :1.3. Waktu dan Tempat Pelaksanaan |
− | 1.4. Ruang Lingkup | + | :1.4. Ruang Lingkup |
− | 1.5. Metode Penulisan | + | :1.5. Metode Penulisan |
− | BAB 2 DESKRIPSI PERUSAHAAN | + | :'''BAB 2 DESKRIPSI PERUSAHAAN''' |
− | 2.1. Profil Perusahaan | + | :2.1. Profil Perusahaan |
− | 2.2. Sejarah Perusahaan | + | :2.2. Sejarah Perusahaan |
− | 2.3. Visi dan Misi | + | :2.3. Visi dan Misi |
− | 2.4. Proyek Perusahaan | + | :2.4. Proyek Perusahaan |
− | 2.5. Lokasi dan Tata Letak Pabrik | + | :2.5. Lokasi dan Tata Letak Pabrik |
− | BAB 3 METODE PENULISAN | + | :'''BAB 3 METODE PENULISAN''' |
− | 3.1. Pendahuluan | + | :3.1. Pendahuluan |
− | 3.2. Strategi Integrity Management (IM) | + | :3.2. Strategi Integrity Management (IM) |
− | 3.2.1. Perencanaan dan penjadwalan program | + | :3.2.1. Perencanaan dan penjadwalan program |
− | 3.2.2. Inspeksi dan Corrosion Monitoring | + | :3.2.2. Inspeksi dan Corrosion Monitoring |
− | 3.2.3. Penilaian Hasil Inspeksi dan Rekomendasi | + | :3.2.3. Penilaian Hasil Inspeksi dan Rekomendasi |
− | 3.2.4. Mitigasi dari Hasil Penilaian | + | :3.2.4. Mitigasi dari Hasil Penilaian |
− | BAB 4 ANALISIS DATA | + | :'''BAB 4 ANALISIS DATA''' |
− | 4.1. Perencanaan RBI pada LPRO-LPV-6 | + | :4.1. Perencanaan RBI pada LPRO-LPV-6 |
− | 4.1.1. Perhitungan Probability of Failure (PoF) | + | :4.1.1. Perhitungan Probability of Failure (PoF) |
− | 4.1.2. Perhitungan Consequence of Failure (CoF) | + | :4.1.2. Perhitungan Consequence of Failure (CoF) |
− | 4.1.3. Perencanaan Waktu Inspeksi dari RBI | + | :4.1.3. Perencanaan Waktu Inspeksi dari RBI |
− | 4.2. Inspection dan Corrosion Monitoring pada Piping KLB Train A Discharge Aftercooler | + | :4.2. Inspection dan Corrosion Monitoring pada Piping KLB Train A Discharge Aftercooler |
− | 4.3. Penilaian Hasil Inspeksi dan Rekomendasi | + | :4.3. Penilaian Hasil Inspeksi dan Rekomendasi |
− | 4.4. Mitigasi dari Hasil Penilaian | + | :4.4. Mitigasi dari Hasil Penilaian |
− | BAB 5 SITE VISIT | + | :'''BAB 5 SITE VISIT''' |
− | 5.1. Pendahuluan | + | :'''5.1. Pendahuluan''' |
− | 5.2. Deskripsi Fasilitas | + | :5.2. Deskripsi Fasilitas |
− | 5.3. Deskripsi Alat | + | :5.3. Deskripsi Alat |
− | 5.3.1. Pig Receiver (MK-R-50-01) | + | :5.3.1. Pig Receiver (MK-R-50-01) |
− | 5.3.2. Inlet Slug Catcher (MK-V-51-01) | + | :5.3.2. Inlet Slug Catcher (MK-V-51-01) |
− | 5.3.3. Filter Separator (MK-V-54-01) | + | :5.3.3. Filter Separator (MK-V-54-01) |
− | 5.3.4. Pig Launcher (MK-L-56-01) | + | :5.3.4. Pig Launcher (MK-L-56-01) |
− | 5.3.5. Liquid Holding Tank (MK-T-57-01) | + | :5.3.5. Liquid Holding Tank (MK-T-57-01) |
− | 5.3.6. Slop Pump (MK-P-58-01) | + | :5.3.6. Slop Pump (MK-P-58-01) |
− | 5.4. Deskripsi Proses | + | :5.4. Deskripsi Proses |
− | BAB 6 PENUTUP | + | :'''BAB 6 PENUTUP''' |
− | 6.1. Kesimpulan | + | :6.1. Kesimpulan |
− | DAFTAR PUSTAKA | + | :'''DAFTAR PUSTAKA''' |
Revision as of 22:23, 11 October 2019
'Daftar Isi
- BAB 1 PENDAHULUAN
- 1.1. Latar Belakang
- 1.2. Tujuan
- 1.3. Waktu dan Tempat Pelaksanaan
- 1.4. Ruang Lingkup
- 1.5. Metode Penulisan
- BAB 2 DESKRIPSI PERUSAHAAN
- 2.1. Profil Perusahaan
- 2.2. Sejarah Perusahaan
- 2.3. Visi dan Misi
- 2.4. Proyek Perusahaan
- 2.5. Lokasi dan Tata Letak Pabrik
- BAB 3 METODE PENULISAN
- 3.1. Pendahuluan
- 3.2. Strategi Integrity Management (IM)
- 3.2.1. Perencanaan dan penjadwalan program
- 3.2.2. Inspeksi dan Corrosion Monitoring
- 3.2.3. Penilaian Hasil Inspeksi dan Rekomendasi
- 3.2.4. Mitigasi dari Hasil Penilaian
- BAB 4 ANALISIS DATA
- 4.1. Perencanaan RBI pada LPRO-LPV-6
- 4.1.1. Perhitungan Probability of Failure (PoF)
- 4.1.2. Perhitungan Consequence of Failure (CoF)
- 4.1.3. Perencanaan Waktu Inspeksi dari RBI
- 4.2. Inspection dan Corrosion Monitoring pada Piping KLB Train A Discharge Aftercooler
- 4.3. Penilaian Hasil Inspeksi dan Rekomendasi
- 4.4. Mitigasi dari Hasil Penilaian
- BAB 5 SITE VISIT
- 5.1. Pendahuluan
- 5.2. Deskripsi Fasilitas
- 5.3. Deskripsi Alat
- 5.3.1. Pig Receiver (MK-R-50-01)
- 5.3.2. Inlet Slug Catcher (MK-V-51-01)
- 5.3.3. Filter Separator (MK-V-54-01)
- 5.3.4. Pig Launcher (MK-L-56-01)
- 5.3.5. Liquid Holding Tank (MK-T-57-01)
- 5.3.6. Slop Pump (MK-P-58-01)
- 5.4. Deskripsi Proses
- BAB 6 PENUTUP
- 6.1. Kesimpulan
- DAFTAR PUSTAKA